Example Pages and Menu Links

Imprimir
PDF

This page is an example of content that is Uncategorized; that is, it does not belong to any Section or Category. You will see there is a new Menu in the left column. It shows links to the same content presented in 4 different page layouts.

  • Section Blog
  • Section Table
  • Blog Category
  • Category Table

Follow the links in the Example Pages Menu to see some of the options available to you to present all the different types of content included within the default installation of Joomla!.

This includes Components and individual Articles. These links or Menu Item Types (to give them their proper name) are all controlled from within the Menu Manager->[menuname]->Menu Items Manager.

Comentários (0)
Comente
Meus Dados:
Comentário:
Código de Segurança
Por favor coloque o código anti-spam que você lê na imagem.

Projeto Diário Treinamentos e Serviços em TI
Rua Vergueiro, 2087 - Conj. 101 - 1º andar - Vila Mariana - São Paulo - Brasil - Cep: 04101-000
Fone : (11) 5087-8943 / Fax: (11) 5087-8810 - Entre em contato conosco